Ribbon board?! Didn't know that was happening.
All the way around. I was told today at work. I do some Daktronic stuff for my job. Looks like I might be doing some more work at JTS.
Ribbon board?! Didn't know that was happening.
All the way around. I was told today at work. I do some Daktronic stuff for my job. Looks like I might be doing some more work at JTS.
All the way around. I was told today at work. I do some Daktronic stuff for my job. Looks like I might be doing some more work at JTS.
Maybe we will get timely scores from other games now ... Love when they are showing 2nd qtr scores when you know the game is almost over.All the way around. I was told today at work. I do some Daktronic stuff for my job. Looks like I might be doing some more work at JTS.
All the way around. I was told today at work. I do some Daktronic stuff for my job. Looks like I might be doing some more work at JTS.
Maybe we will get timely scores from other games now ... Love when they are showing 2nd qtr scores when you know the game is almost over.
Wait so is underbidding a good or bad thing?
Hopefully we get another $1 million worth of it with all underbidding
Despite being $1M underbudget at this point, I wouldn't get too antsy about spending that windfall just yet. Change orders have a habit of piling up in a hurry.
Bidding out in phases gives Iowa State more control.A few questions.
Were the engineer's estimates public?
Why was this bid out in phases instead of one whole project?
How are certain things able to be contracted without being bid while others need bids?
A few questions.
Were the engineer's estimates public?
Why was this bid out in phases instead of one whole project?
How are certain things able to be contracted without being bid while others need bids?
All the way around. I was told today at work. I do some Daktronic stuff for my job. Looks like I might be doing some more work at JTS.
A few questions.
Were the engineer's estimates public? I find the estimates when the item goes for bid, normally 21 days before the bid is due. It appears there are three more SEZ bids due through 2014.
Why was this bid out in phases instead of one whole project? See the answers from others. Sometimes materials provided by owner do not get marked-up by the contractor. However, I think ISU accepts the risk of having provided defective materials if there is a future problem.
How are certain things able to be contracted without being bid while others need bids?
I wondered about that as well. The financial justification is Daktronics provided the existing NEZ video board and scoreboard/video ribbon in Hilton. The control room is somewhere in Hilton and Daktronics provides technical staff at every event. A new vendor would require a second control room and additional ISU staff to provide content. Imagine the outcry if the NEZ and SEZ didn't provide the same content :smile:
Simply conjecture, but I wouldn't be surprised a previous request for bid didn't include the right to negotiate for this additional work.
I'm sure it's been mentioned before, but why is the control room in Hilton?
I'm sure it's been mentioned before, but why is the control room in Hilton?
I'm sure it's been mentioned before, but why is the control room in Hilton?
I'm sure it's been mentioned before, but why is the control room in Hilton?