I did this once but ended up emptying it out. The thing was so heavy, I was certain they would reject it.
There are 3 numbers to consider:
- How much the garbage company says you can put in there.
- How much the workers loading the truck care about number 1.
- How much can the container hold before it just rips apart when the truck picks it up?
Feels like #3 is the most important these days. The first two mattered more when they had people physically picking them up and dumping in the truck. Now with the automated systems, it all matters what the truck arm and bin can hold.
Though with these automated systems, it wouldn't be hard for them to change their pricing systems to charge by weight instead of a flat fee. I'd imagine that's on the horizon under the premise of saving the environment.