I-35 / US 30 Flyover Progress

inCyteful

Well-Known Member
SuperFanatic
SuperFanatic T2
Feb 28, 2012
12,555
12,632
113
Fort Collins, CO
This reminds me - didn't something similar occur in the construction of Jack Trice? I was still in HS but remember my dad talking about it - they had to rebuild or re - pour the pillars for the stands? It was all kept hush hush but everyone in the community noticed it - good case study in bad PR management.
 
  • Creative
Reactions: LowOverhead

cycloner29

Well-Known Member
Dec 17, 2008
12,839
12,397
113
Ames
"If I don't get this contract, my company goes under....." - Shawkshank Redeption scene.

"My Mrs. baked you this fine pie..."

upload_2018-6-18_12-30-31.png
 

Doc

This is it Morty
Aug 6, 2006
37,437
21,963
113
Denver
This reminds me - didn't something similar occur in the construction of Jack Trice? I was still in HS but remember my dad talking about it - they had to rebuild or re - pour the pillars for the stands? It was all kept hush hush but everyone in the community noticed it - good case study in bad PR management.

IIRC, my concrete prof told us the upper deck was deflecting more than the engineer anticipated so they had to do fixes to it.
 

Cycsk

Year-round tailgater
SuperFanatic
SuperFanatic T2
Aug 17, 2009
28,412
17,340
113
If you look at the 1st, 2nd & 3rd piers for the exit from 35 N to 30 W while driving eastbound on 30 (with the 1st pier being the one that is actually attached to the bottom of the ramp), the 2nd pier is visibly lower than the slope of the 1st & 3rd piers, meaning the off ramp would have a dip in the middle of the curve. It's clearly visible to the naked eye.


I've seen that lower pier and tried to make sense of it (maybe they could do something to make it higher). Anybody else notice the odd way they have placed some of the bricks (with bunches of the same color)? And is it an attempt at cardinal and gold with the bricks?
 
  • Winner
Reactions: Jfalvey

stvfarmboy

Active Member
May 20, 2006
470
55
28
42
Ames, IA
This reminds me - didn't something similar occur in the construction of Jack Trice? I was still in HS but remember my dad talking about it - they had to rebuild or re - pour the pillars for the stands? It was all kept hush hush but everyone in the community noticed it - good case study in bad PR management.
I don't know all of the details but a professor talked about it once and I believe it was something with the type of soil or how much it compacted during or after construction. Someone on here may know more than me.
 

mj4cy

Asst. Regional Manager
Staff member
Mar 28, 2006
31,814
14,783
113
Iowa
I too was wondering why this is such a cluster. I was down in KC a month ago and the speed they can put these types of bridges up is second nature. My guess is the contractor is in over his head and the DOT is also newer to how to handle these types of bridges/construction projects.
 

mj4cy

Asst. Regional Manager
Staff member
Mar 28, 2006
31,814
14,783
113
Iowa
I don't know all of the details but a professor talked about it once and I believe it was something with the type of soil or how much it compacted during or after construction. Someone on here may know more than me.

Yeah I believe it was short term vs. long term settlement effects.
 
  • Informative
Reactions: Doc

Cyclones_R_GR8

Well-Known Member
SuperFanatic
SuperFanatic T2
Feb 10, 2007
23,958
25,940
113
Omaha
Just stuff a few folded up napkins or a coaster in between and call it good.
Years ago I worked on a construction crew and we jacked up the floors of a parking garage and put shims in. Boy did that look bad on the inside.
 

cyclone87

Well-Known Member
Apr 6, 2011
3,319
1,541
113
Ames, IA
I've seen that lower pier and tried to make sense of it (maybe they could do something to make it higher). Anybody else notice the odd way they have placed some of the bricks (with bunches of the same color)? And is it an attempt at cardinal and gold with the bricks?

This is a nod to the ABC computer created at Iowa State. The brick pattern supposedly correlates to code on old punch cards that early computers used.

"A special feature of this project will be a historical reference to John Vincent Atanasoff’s invention of the first computer at Iowa State. The bridge pier for the ramp will display a coded message reading “John Vincent Atanasoff invented the first computer at Iowa State College in 1939,” giving much-deserved attention to Atanasoff’s accomplishments."
http://www.amestrib.com/article/20160216/News/302169976
 

Sigmapolis

Minister of Economy
SuperFanatic
SuperFanatic T2
Aug 10, 2011
26,928
41,629
113
Waukee
Like others have said, it depends on who's mistake it is. If I (as the contractor, which I happen to be), make something 36" tall instead of 3'6" tall, then that is on me. If however the designer said 36" tall on the drawings and actually wanted it 3'6" tall, then I'm submitting a change order for extra work and delay, which the state would then be responsible for.

A lot of that stuff is normally caught by the contractor, but beam seats, or top of concrete slab elevations are hard for the contractor to back check, especially for smaller contractors that don't have tons of engineering staff supporting them.

spinal-tap-stonehenge-napkin.jpg
 

CycloneBob

Well-Known Member
Aug 9, 2010
850
343
63
Ames
Not only are the alleged construction mistakes concerning, they seem to be working at a snails pace. Why don't they use 7 days and long hours to make some progress?
 
  • Agree
Reactions: irish

Sousaclone

Well-Known Member
Apr 29, 2006
1,853
1,179
113
North of Seattle
Not only are the alleged construction mistakes concerning, they seem to be working at a snails pace. Why don't they use 7 days and long hours to make some progress?

Depends on what there schedule and any schedule changes they have. The job schedule (that they are held to) may not show the need.

Long days & 7 days a week is a good way to spend a ton of money and not necessarily get a ton of results. It burns your crews out and if you aren't setup to run that way, it spirals rapidly out of control. Or, the LDs may be less than the cost of paying all that OT.
 
  • Winner
Reactions: deadeyededric

VeloClone

Well-Known Member
Jan 19, 2010
48,460
39,264
113
Brooklyn Park, MN
This is a nod to the ABC computer created at Iowa State. The brick pattern supposedly correlates to code on old punch cards that early computers used.

"A special feature of this project will be a historical reference to John Vincent Atanasoff’s invention of the first computer at Iowa State. The bridge pier for the ramp will display a coded message reading “John Vincent Atanasoff invented the first computer at Iowa State College in 1939,” giving much-deserved attention to Atanasoff’s accomplishments."
http://www.amestrib.com/article/20160216/News/302169976
Yes, because a "coded message" will give plenty of attention to the ABC computer. Of course only people who already know what it is will give it attention...
 
  • Agree
Reactions: khardbored

Latest posts

Help Support Us

Become a patron