Hilton 1971 $8.15M View attachment 81421
the plastic covered hole in the ground 1983 $18.4M View attachment 81422
Who got the better deal?
not to discount your point up there but the cost difference of construction between 1971 and 1983 makes up for the difference between the two (meaning if you build Hilton in 1983, it would cost about the same as carver). Regardless, you’re correct in calling it a plastic covered hole in the ground.