This is going to make getting in and out of the west side even harder.
 

BigJCy

Well-Known Member
Apr 11, 2006
19,853
16,601
113
The NW entrance to the stadium will be closed this fall. The NE, E, S and W entrances will remain open. The NW entrance being closed is really going to suck after games.
That West side entrance going to be crammed I would think. Wonder if they could add some entry/exit points in that area?
 

jdcyclone19

Well-Known Member
Apr 14, 2017
3,496
4,810
113
Iowa
That West side entrance going to be crammed I would think. Wonder if they could add some entry/exit points in that area?

I was just there today - It looks like they changed the barricades and fence since 2 weeks ago. It looks like the NW entrance might be open for now but who knows where the project will be at once fall gets here.
 
Last edited:

BWRhasnoAC

Well-Known Member
SuperFanatic
SuperFanatic T2
Apr 10, 2013
25,119
22,176
113
Dez Moy Nez
Can anybody tell me what they are currently doing? Leveling the ground to get the footings set?

I’ve been sitting at work watching some dude spread gravel with a skid loader for the last 15 mins. Oddly satisfying.
https://www.fpm.iastate.edu/webcam/stadium/
That's the base layer before they poor the foundation. Footings are probably done if they are at that point.
 
  • Informative
Reactions: cyclonedave25

CYCLNST8

Well-Known Member
Jul 19, 2008
10,909
12,404
113
Urbandale
www.gimikk.com
I’ve been sitting at work watching some dude spread gravel with a skid loader for the last 15 mins. Oddly satisfying.

giphy.gif
 

scottie33

Well-Known Member
Nov 25, 2006
2,710
114
63
38
Ames, Iowa
Can anybody tell me what they are currently doing? Leveling the ground to get the footings set?

I’ve been sitting at work watching some dude spread gravel with a skid loader for the last 15 mins. Oddly satisfying.
https://www.fpm.iastate.edu/webcam/stadium/

Might be doing site utilities as it looks like there is water and storm piping staged on the South side of the parking lot...Might be using the rock as a backfill after the piping is installed??
 
  • Informative
Reactions: cyclonedave25

norsemen

Active Member
Apr 13, 2006
201
167
43
Pace has picked up over the past couple weeks.

It seemed the foundational work took forever. Of course our fall monsoonal season did not help.
 

Remo Gaggi

Well-Known Member
Aug 28, 2018
3,759
5,224
113
Let's all hope that the bottleneck that was the entry at the north end will not be an issue this fall. And in two years the simpletons in the hok band will be able to walk out to their bus without getting molested.
 

Frak

Well-Known Member
SuperFanatic
SuperFanatic T2
Apr 27, 2009
10,797
6,024
113
Pace has picked up over the past couple weeks.

It seemed the foundational work took forever. Of course our fall monsoonal season did not help.

Yeah, things seem to be moving pretty quickly now, despite the weather. I think that we're going to see the structure up by the end of the summer and probably enclosed by the time the first game hits, or at least by October. Looking at the floor plans:

https://www.iowaregents.edu/media/cms/1118_PF5__ISU_Register_6512BA850B304.pdf

The part the juts out to the SW is batting cages. Right now, they are working on the ground level floor. The two concrete "cubes" on either side of what looks to be the main entrance on the east I would guess are elevator shafts. Pretty much everything to the west of the beams going N/S is going to be the new locker room/lounge.