JTS Improvements - Want More

Okay, so they’re expanding the actual video board to the supports, right?

So……the next goal is one that extends beyond both supports?
It’s awesome (and overdue) to extend the video board the entire width. Excited to see it!

I am disappointed that Pollard changed the decision on the south board to NOT expand the full width (based on the latest info). The I-State and Big 12 logo “covers” or whatever the heck those things are look cheap as hell and faded to pink in like 4 days. Goodness those look cheesy. They did originally bid out both boards to extend the full width and I guess at some point we cheap’d out on the north one. Given our dinky little press box (ahhhh the horror!!), having 2 giant full-width video boards mirroring each other would have been a very unique and awesome ‘thing’ to draw people’s attention and provide a bit of a wow factor that Trice doesn’t really have, enhancing the environment in a way that would be well-worth the minuscule cost we “saved” by scaling back.

Edit. I’m going to get scolded by the JP Statue Guild here ain’t I :D
 
The video board on the north goes end to end of the supports (logos will be gone). On the south end, the logos remain and the video board space will not change on that board.
Yep, and that sucks on the north end.
 
It’s awesome (and overdue) to extend the video board the entire width. Excited to see it!

I am disappointed that Pollard changed the decision on the south board to NOT expand the full width (based on the latest info). The I-State and Big 12 logo “covers” or whatever the heck those things are look cheap as hell and faded to pink in like 4 days. Goodness those look cheesy. They did originally bid out both boards to extend the full width and I guess at some point we cheap’d out on the north one. Given our dinky little press box (ahhhh the horror!!), having 2 giant full-width video boards mirroring each other would have been a very unique and awesome ‘thing’ to draw people’s attention and provide a bit of a wow factor that Trice doesn’t really have, enhancing the environment in a way that would be well-worth the minuscule cost we “saved” by scaling back.

Edit. I’m going to get scolded by the JP Statue Guild here ain’t I :D
I like others would love to see the largest video boards as possible. The issue is MONEY I hope that everyone who posts on here are people who donate to the school for projects like this. If not don't complain that you are not getting what you want.
 
I like others would love to see the largest video boards as possible. The issue is MONEY I hope that everyone who posts on here are people who donate to the school for projects like this. If not don't complain that you are not getting what you want.
I thought they were free... just pick a size and we are good! :jimlad:
 
  • Funny
Reactions: Aclone and NWICY
Utah and WVU guy rate Big 12 stadiums. WVU is honest, Utah guy is delusional (like their entire fanbase). JTS comes in at #4. BYU is #1. Criteria include: home win %, home attendance, attendance % of capacity

 
It looks like the city and university have agreed to a plan to finally extend S 16th Street with 4 lanes to University Blvd. This is long overdue and should help a lot with post game traffic. I don't know the timeline for completion.
Hopefully they can get it done between FB seasons.
 
  • Haha
Reactions: CycloneDaddy
It looks like the city and university have agreed to a plan to finally extend S 16th Street with 4 lanes to University Blvd. This is long overdue and should help a lot with post game traffic. I don't know the timeline for completion.
The sooner, the better. Need to complete it before a season starts. Can't imaging how ugly it would be having construction happening during the Football season.
 
From the City of Ames:

"The construction will be completed in two phases with the east side of the project occurring in the 2025 construction season and the west of the project occurring in the 2026 construction season. The contractor will be required to be substantially complete with each phase’s construction activities prior to the Iowa State University football season."
 
From the City of Ames:

"The construction will be completed in two phases with the east side of the project occurring in the 2025 construction season and the west of the project occurring in the 2026 construction season. The contractor will be required to be substantially complete with each phase’s construction activities prior to the Iowa State University football season."
If they havent started is that even remotely possible for 2025?
 
From the City of Ames:

"The construction will be completed in two phases with the east side of the project occurring in the 2025 construction season and the west of the project occurring in the 2026 construction season. The contractor will be required to be substantially complete with each phase’s construction activities prior to the Iowa State University football season."
This makes sense to do it in 2 phases. It's a sizable project.
 
  • Winner
Reactions: JimmyChitwood
From the City of Ames:

"The construction will be completed in two phases with the east side of the project occurring in the 2025 construction season and the west of the project occurring in the 2026 construction season. The contractor will be required to be substantially complete with each phase’s construction activities prior to the Iowa State University football season."
If this was in Omaha it would take 5 years and it would be already cracking by the time they opened it up
 
This makes sense to do it in 2 phases. It's a sizable project.

It probably does make sense, but this isn't a very big stretch of road. We're talking, what, a city block long? Two at most. There's already a turning lane on S16th heading north, so they would just need to hook into that.
 
  • Agree
Reactions: beentherebefore

Help Support Us

Become a patron