JTS Improvements - Want More

Aclone

Well-Known Member
Dec 14, 2007
26,870
23,380
113
Des Moines, Ia.
Is it just me, or is the color off on the webcam this morning? I was wondering why none of the workers are wearing safety orange or, uh, yellow/green, when a CyRide bus went by and looked black.
 

TXCyclones

Well-Known Member
SuperFanatic
SuperFanatic T2
Sep 13, 2011
11,404
12,619
113
TX
Is it just me, or is the color off on the webcam this morning? I was wondering why none of the workers are wearing safety orange or, uh, yellow/green, when a CyRide bus went by and looked black.

Just you. There's a guy on the NW hillside now in yellow/green vest and CyRide looks normal. And the NW hillside looks amazingly green today.
 
  • Agree
Reactions: nrg4isu

DBQR4CY

Well-Known Member
Jun 7, 2013
702
772
93
Ankeny(By way of Dubuque)
So what's left to do (outside)? Looks like some more concrete is being poured but the Jacobson is blocking the view. The plaza needs sod and probably trees planted. The walkway needs it's fencing. Then finishing landscaping and...?
 

Aclone

Well-Known Member
Dec 14, 2007
26,870
23,380
113
Des Moines, Ia.
So what's left to do (outside)? Looks like some more concrete is being poured but the Jacobson is blocking the view. The plaza needs sod and probably trees planted. The walkway needs it's fencing. Then finishing landscaping and...?
Creating the giant bowl for all of the cherry recruits CMC is getting commitments from.
 
  • Like
Reactions: DBQR4CY

danwbarrett

Well-Known Member
Mar 29, 2006
425
476
63
72
University City, MO
So what's left to do (outside)? Looks like some more concrete is being poured but the Jacobson is blocking the view. The plaza needs sod and probably trees planted. The walkway needs it's fencing. Then finishing landscaping and...?
Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
 
  • Like
Reactions: DBQR4CY

Cloneon

Well-Known Member
Oct 29, 2015
3,004
3,129
113
West Virginia
Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
Hadn't yet thought about the light posts. But, I'd be conservative on the post colors, but have the jersey 'reveal' for the week be on banners on those posts.
 

Aclone

Well-Known Member
Dec 14, 2007
26,870
23,380
113
Des Moines, Ia.
Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
Don’t forget lights and (presumably) a railing for the concourse walkway, above the hillsides.
 

Aclone

Well-Known Member
Dec 14, 2007
26,870
23,380
113
Des Moines, Ia.
Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
Plus, whatever they’re working on now, along the retaining wall.

Still can’t upload an image, ongoing around 1:30.