No. They mowed Jill vertically (to go against the pattern of the sod), so you’ll be able to tell when they do.They mow the NW Hillside? Appears so to me.
Aside from all of the flags waving and signal rockets going off in this forum.
No. They mowed Jill vertically (to go against the pattern of the sod), so you’ll be able to tell when they do.They mow the NW Hillside? Appears so to me.
No, but if they follow the same schedule as the NE hillside, it will be mowed on Monday (make that Tuesday because of the holiday).They mow the NW Hillside? Appears so to me.
Is it just me, or is the color off on the webcam this morning? I was wondering why none of the workers are wearing safety orange or, uh, yellow/green, when a CyRide bus went by and looked black.
Thanks. I’ll try restarting my phone.Just you. There's a guy on the NW hillside now in yellow/green vest and CyRide looks normal. And the NW hillside looks amazingly green today.
Thanks. I’ll try restarting my phone.
Creating the giant bowl for all of the cherry recruits CMC is getting commitments from.So what's left to do (outside)? Looks like some more concrete is being poured but the Jacobson is blocking the view. The plaza needs sod and probably trees planted. The walkway needs it's fencing. Then finishing landscaping and...?
Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.So what's left to do (outside)? Looks like some more concrete is being poured but the Jacobson is blocking the view. The plaza needs sod and probably trees planted. The walkway needs it's fencing. Then finishing landscaping and...?
Hadn't yet thought about the light posts. But, I'd be conservative on the post colors, but have the jersey 'reveal' for the week be on banners on those posts.Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
Don’t forget lights and (presumably) a railing for the concourse walkway, above the hillsides.Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
Plus, whatever they’re working on now, along the retaining wall.Still needed: The presumably cardinal and white light posts on the plaza, flag poles on the precast panels, more concrete on the locker room side of the SPC, and the finished facia on the ring in front of the Jacobson connecting the NW and NE precast panels.
I said cardinal and white only because that’s what’s shown in the latest renderings.Hadn't yet thought about the light posts. But, I'd be conservative on the post colors, but have the jersey 'reveal' for the week be on banners on those posts.
Putting down topsoil to the west of the tunnel mouth. 13:30 to 13:45-ish.
Redhead? ‘83.I dated her in '88. It was a fitting nickname.