I think a main reason the pressbox has never been replaced is because it'd have to effectively be a 7-story building just to reach the base level of the top of the upper deck, since the concourse is basically a manmade berm three stories in the air, then be 3-4 stories on top of that. That's an expensive 10-11 story building to put on the west side of the stadium. The only way to have justified that would have been to put most of the Stark Performance Center components also into a new pressbox structure on the west side too, which is very similar to what K-State did. Luckily for K-State tho, they have a concourse at ground level and no west upper deck, so their entire structure is only 6-7 stories compared to the 10-11 ours would have to be to have the same amount of suites up high.