They’ve started the formwork for the east hillside walkway. If you look close, you can see it behind the video board. However, they will need to lay down a lot of rebar, so doubtful that will be poured today either.I laughed—because I read it that was at first, too!
But they just brought in a pumper truck with a black boom. I think they are pouring the retaining wall for the west ramp (I was probably wrong the other day about them installing precast panels for that).
Edit: I meant this be a reply to your post about pouring concrete. Maybe I need to take break from posting.
Last edited: