JTS Improvements - Want More

I laughed—because I read it that was at first, too!
They’ve started the formwork for the east hillside walkway. If you look close, you can see it behind the video board. However, they will need to lay down a lot of rebar, so doubtful that will be poured today either. :confused:

But they just brought in a pumper truck with a black boom. I think they are pouring the retaining wall for the west ramp (I was probably wrong the other day about them installing precast panels for that).:)

Edit: I meant this be a reply to your post about pouring concrete. Maybe I need to take break from posting. :oops:
 
Last edited:
  • Like
Reactions: Aclone
Crane can also perform double duty after the Iowa game and get their marching band to the Bus :jimlad: Hope they don't "swing" too much. :jimlad:
 
I can’t even tell him the last time I’ve been to a ticket office. Other than the small weird place tickets for less has in Kansas City for the Big12 tournament.

Walking from the P&L to that ticket retrieval site I had to check my phone multiple times to make sure I was heading in the right direction. Definitely an interesting location!