JTS Improvements - Want More

cygrads

Well-Known Member
Jul 27, 2007
4,969
2,728
113
Altoona, IA
Just a refresher of what the bridge will look like when complete.

View attachment 90862
View attachment 90867
View attachment 90868
View attachment 90865
View attachment 90869

Dont think there is an elevator, just a long ramp that extends almost to G7
It appears the renderings have changed. Before the towers had angled tops and space within the towers for stairs and \or elevators. Now flat tops and a long long ramp. Am I wrong or has this changed over the last few months due to OuT's future departure?
 

cyclone87

Well-Known Member
Apr 6, 2011
3,316
1,538
113
Ames, IA
The design has been the same since last year. There will be stairs, but no elevator. The first was just an early vision for the project tied into the entertainment district idea when that came out
 

theshadow

Well-Known Member
Apr 19, 2006
19,969
19,622
113
Parking lots going to BOR next week for final approval (i.e., to proceed with construction), to be finished by 2022 football season.

Project 1 ($5.5M)
*Replacement of B1 (north of Scheman)
*Replacement of F (NW of Stephens)
*+380 new spots (Scheman/Fisher)
*+parking/drop-off area between Stephens and Fisher

Project 2 ($8.1M)
*Conversion of G7 to RV
*330 RV spaces with dedicated concrete pad and electrical for each
*New lighting
*Pedestrian trail north from G4/G5 (plus bridge over Worrell Creek) to East Gateway Bridge
 
  • Like
Reactions: cyclone87

JM4CY

Well-Known Member
SuperFanatic
SuperFanatic T2
Aug 23, 2012
37,883
74,605
113
America
The SPC webcam's last image:

View attachment 91589
f3ee7e10-f665-4307-a7ea-2215a25e56d3_text.gif
 

cyfan92

Well-Known Member
Sep 20, 2011
8,217
13,091
113
Augusta National Golf Club
Parking lots going to BOR next week for final approval (i.e., to proceed with construction), to be finished by 2022 football season.

Project 1 ($5.5M)
*Replacement of B1 (north of Scheman)
*Replacement of F (NW of Stephens)
*+380 new spots (Scheman/Fisher)
*+parking/drop-off area between Stephens and Fisher

Project 2 ($8.1M)
*Conversion of G7 to RV
*330 RV spaces with dedicated concrete pad and electrical for each
*New lighting
*Pedestrian trail north from G4/G5 (plus bridge over Worrell Creek) to East Gateway Bridge

Someone told me something about Cytown that will excite a lot of fans! This is pollard's baby and he's determined