JTS Improvements - Want More

I have not been to Ames for a few weeks. Anyone know if any visible work has been done on the gateway bridge?
 
When I go back and watch the recording (around 13:59), it looks like they’re unrolling something.

A base for precast slabs, like what will be around the grass in the plaza?
Do we know if grass is intended between the two north-south sidewalks in the plaza? The renderings have that area much darker than the grass shown on either side
 
When I go back and watch the recording (around 13:59), it looks like they’re unrolling something.

A base for precast slabs, like what will be around the grass in the plaza?
Do we know if grass is intended between the two north-south sidewalks in the plaza? The renderings have that area much darker than the grass shown on either side
 
So what's left to do (outside)? Looks like some more concrete is being poured but the Jacobson is blocking the view. The plaza needs sod and probably trees planted. The walkway needs it's fencing. Then finishing landscaping and...?

…the Jack Trice stripes sculpture?
 
  • Agree
Reactions: Remo Gaggi
Do we know if grass is intended between the two north-south sidewalks in the plaza? The renderings have that area much darker than the grass shown on either side

It'll be turf. We're a turf school. Oh wait. (that'd be ironic though, huh?)