Definitely need clarification on this. The picture and words below contradict each other.Interesting, I was looking at this-
View attachment 66875
I like all of it except for the elevated center ring.
Definitely need clarification on this. The picture and words below contradict each other.
I don't think all of them are paved. Some grass, some gravel according to this picture. I could be wrong.3600 paved spaces to the east. Glad to hear it
My other thought is that it's saying the current intramural plan is for 160-gravel/500-grass with possibility to pave all of them later. Maybe? You're right it's confusing.Definitely need clarification on this. The picture and words below contradict each other.
It should have been done with the performance center. Just as the west side facade could have been integrated with the Indoor facility, but at least that was in times of desperation.I wish they also included Jack trice NEZ renovation plans. Closing the end zone gives better stadium experience instead of the current horse shoe look
It’s such a waste to not do a NEZ project as or with a performance center that’s basically in the NEZ. It doesn’t give me much faith in an even more complex undertaking like this getting done.I dont think we will see an actual stadium upgrade plan until after the performance center and Hilton are complete now.
Could be. I just know that the maintenance (snow, missing metal railings, light bulbs, chunks of crumbling concrete) on the old ones that were between Scheman, Hilton, and Stephens started to lapse. They finally took them down and refurbed the existing ones.But it's got a laser beam tornado in the middle, so that's sweet!
I'm thinking they got to that point basically because it looks like they've elevated the foundations of the buildings above flood stage and needed something pretty to get you back down to parking lot level.
Apparently this is what itll look like:It’s such a waste to not do a NEZ project as or with a performance center that’s basically in the NEZ. It doesn’t give me much faith in an even more complex undertaking like this getting done.
It should have been done with the performance center. Just as the west side facade could have been integrated with the Indoor facility, but at least that was in times of desperation.
It’s such a waste to not do a NEZ project as or with a performance center that’s basically in the NEZ. It doesn’t give me much faith in an even more complex undertaking like this getting done.
Could be. I just know that the maintenance (snow, missing metal railings, light bulbs, chunks of crumbling concrete) on the old ones that were between Scheman, Hilton, and Stephens started to lapse. They finally took them down and refurbed the existing ones.
Expensive hillsApparently this is what itll look like:
Normally it's a cost sharing issue.Maybe that gets better with athletics running the show and bringing in more revenue with projects like these. I'm guessing the deferred maintenance at the ISC, such as the things you mentioned and the crumbling parking lots isn't for lack of desire, it's for lack of funding.