The South Endzone Project has started!!!

Discussion in 'Football' started by isufbcurt, Jul 7, 2014.

  1. isufbcurt

    isufbcurt Well-Known Member

    Apr 21, 2006
    9,725
    1,028
    113
    Male
    CPA
    Newton
    Ratings:
    +3,254 / 146 / -0
    As I was driving by the stadium today construction crews are out there digging and putting in what appears to be drainage pipe. I know it's not all out construction but at least they have started.

    I am so excited for this thing to be done!!
     
  2. CYCLNST8

    CYCLNST8 Well-Known Member

    Jul 19, 2008
    6,211
    734
    113
    Male
    Urbandale
    Ratings:
    +1,954 / 70 / -0
    [​IMG]

    There. I did it first.
     
  3. Cycsk

    Cycsk Well-Known Member

    Aug 17, 2009
    15,603
    507
    113
    Ratings:
    +1,313 / 61 / -0
    #3 Cycsk, Jul 7, 2014
    Last edited: Jul 7, 2014
    Sat on those pipes for the fireworks, wondering if they were getting ready to start the project soon.
     
  4. junckerl

    junckerl Member

    Feb 18, 2009
    373
    17
    18
    Male
    Customer Service
    Saint Anthony
    Ratings:
    +23 / 0 / -0
    Its not real until there is a webcam.
     
  5. GWad

    GWad Member

    Aug 22, 2013
    807
    6
    18
    Ratings:
    +6 / 0 / -0
    Where is the damn webcam ????
     
  6. Haverhill

    Haverhill Well-Known Member

    Jan 4, 2009
    5,666
    197
    63
    Male
    College Station, TX
    Ratings:
    +219 / 3 / -0
    Some student with time on their hands (its summer after all) needs to stop by the stadium once a week or so with a camera phone and snap a few pics and upload them. Facility-crazed alums like myself who live outside Ames want constant updates on the stadium progress!
     
  7. awd4cy

    awd4cy Well-Known Member

    Dec 29, 2010
    14,730
    407
    83
    Eastern Iowa
    Ratings:
    +1,496 / 105 / -0
    Where's Cyber when you need him?
     
  8. ribsnwhiskey

    ribsnwhiskey Well-Known Member

    Feb 6, 2009
    6,808
    320
    83
    Ames
    Ratings:
    +545 / 10 / -0
    I'm not a student and I didn't take pictures, but I drove by yesterday and there is progress being made. Its just utilities work though, nothing too interesting. I just saw dirt piles, underground pipes and cable. The big stuff won't start until after this season.
     
  9. dunar

    dunar Well-Known Member

    Aug 31, 2007
    1,822
    39
    48
    Male
    Data Migration Specialist
    West Des Moines, IA
    Ratings:
    +50 / 0 / -0
    Last time I saw him was on a conference-centric forum that has since shuttered...

    The airport stakeout was epic, we'll always have that memory!
     
  10. crs8975

    crs8975 Member

    Aug 14, 2013
    257
    5
    18
    Lakewood, CO
    Ratings:
    +11 / 0 / -0
    ...Care to elaborate on this for a newbie?
     
  11. UNIGuy4Cy

    UNIGuy4Cy Well-Known Member

    Nov 11, 2009
    8,553
    132
    63
    Accountant
    Polk City
    Ratings:
    +172 / 4 / -0
    Gene Chizik watch I believe. As in going to Auburn.
     
  12. dunar

    dunar Well-Known Member

    Aug 31, 2007
    1,822
    39
    48
    Male
    Data Migration Specialist
    West Des Moines, IA
    Ratings:
    +50 / 0 / -0
    Now my memory is failing too. IRRC it was waiting for someone to show up, maybe a big recruit? Or something to do with realignment? I tried a search and don't have time to pick through all the results (mostly just references to sending him to the airport...) At the time everyone was egging him on to go out to the airport, it was hilarious, I promise!
     
  13. Cycsk

    Cycsk Well-Known Member

    Aug 17, 2009
    15,603
    507
    113
    Ratings:
    +1,313 / 61 / -0
    Went by today. Lots of activity. Looks like they have torn up the walkways at the south entrance, as well as the walkways that go up the hill on each side from the south entrance. It looks like they have dug into the hillsides from the south.

    Wonder what it is going to be like on game day. Hope it doesn't rain . . . except for all the NDSU people on this hillsides. :twitcy:
     
  14. A-town Cy

    A-town Cy Well-Known Member

    Aug 4, 2006
    5,977
    263
    83
    Huxley
    Ratings:
    +265 / 0 / -0
    Webcam plz
     
  15. cyhiphopp

    cyhiphopp Well-Known Member

    Jan 9, 2009
    26,262
    1,894
    113
    Male
    Ankeny
    Ratings:
    +3,851 / 56 / -0

    [​IMG]
     
  16. wesley_w

    wesley_w Well-Known Member

    Oct 23, 2006
    1,749
    200
    63
    Ames, Iowa
    Ratings:
    +217 / 3 / -0
    It looks to me like the hillsides on the south will be about 1/3 of their former capacity. There is already a fence up to separate the construction part with the rest of the hillside.
     
  17. RubyClone

    RubyClone Active Member

    Mar 21, 2014
    3,111
    17
    38
    Ratings:
    +17 / 0 / -0
    Not happening without pictures.
     
  18. PabloDiablo

    PabloDiablo Well-Known Member

    Feb 10, 2011
    2,823
    99
    48
    Physical Therapist
    Omaha, NE
    Ratings:
    +99 / 0 / -0
    Was there access to the bleachers from the south entrance or was it too torn up?
     
  19. Cycsk

    Cycsk Well-Known Member

    Aug 17, 2009
    15,603
    507
    113
    Ratings:
    +1,313 / 61 / -0

    Couldn't tell from my truck. May need to go over sometime when they aren't working.

    It looks like it will be pretty messy, but they could still have paths to the endzone bleachers. Not sure there is any other way. They could just lay down some gravel and create paths in the dirt.
     
  20. UNIGuy4Cy

    UNIGuy4Cy Well-Known Member

    Nov 11, 2009
    8,553
    132
    63
    Accountant
    Polk City
    Ratings:
    +172 / 4 / -0
    Pollard said that on Murph and Andy, hillsides on the south end will be smaller this season with the expansion.
     

Share This Page