1. I would just replace all of the seats at JTS with benches with seat backs. All new seating would look pretty sweet. Estimated cost $2M
2. Press box - make it half as tall, but three times as wide. That would go pretty much the length of the field. ~$35M
3. Widen the concourses in Hilton, adding glass out to the columns. ~$30M
4. New MBB/WBB practice facility attached to Hilton. Move VB and Wrestling to Sukup. ~$40M
5. NEZ - Connect the east and west stands with permanent stands the height of the Jacobson balcony. Team would have a tunnel to run through to enter the field. You'd have to put up a big retaining wall to keep the hillsides, but that's not impossible. ~$20M
2. Press box - make it half as tall, but three times as wide. That would go pretty much the length of the field. ~$35M
3. Widen the concourses in Hilton, adding glass out to the columns. ~$30M
4. New MBB/WBB practice facility attached to Hilton. Move VB and Wrestling to Sukup. ~$40M
5. NEZ - Connect the east and west stands with permanent stands the height of the Jacobson balcony. Team would have a tunnel to run through to enter the field. You'd have to put up a big retaining wall to keep the hillsides, but that's not impossible. ~$20M
Last edited: