Was in Ames Saturday and was amazed to see the G6/G7 replacement project underway. Right up from along University. This is going to be a huge upgrade with RV pads (both electric and not) and a sky bridge over University. I didn't realize it was going to stretch from So 4th to 16th. I can't wait until next year but the walk from the current G7 to the stadium could be treacherous. Hope they make a road .