Results 1 to 6 of 6

Thread: JT update 06/17

  1. #1
    Addict
    Points: 148,628, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 1.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,643
    Points
    148,628
    Level
    100
    Thumbs Up
    Received: 5
    Given: 0

    JT update 06/17

    As many of you can see by the web cam, the renovations at JT are moving quickly. I was able to tour the construction this past week but my batteries died in the camera so I didn't get very good photos, or very many.

    Club section is nearly done. Basically, all that is left in the club section is finish work (installing flooring, fixtures, tables, etc.). The east concourse still needs to be repaved.

    The field looks really good. The sod seems to be taking hold and it is hard to see any lines. They have removed all the old Iowa State markers from the sideline walls.

    The suites still need some work. They are still working on installing movable glass windows in some of the suites, including in the press box. Some electrical panels are still being installed and after that it is mostly finishing work.

    The concession stands are nearly completed. Some of the bathrooms already have the fixtures and stalls up and the others are almost there. The concessions appear to also be almost done.

    They have also began paving the west concourse and are preparing to pour the steps. Something I didn't know, they are replacing some of the rails on the second deck.



  2. #2
    Speechless
    Points: 353,319, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 1.0%
    Achievements:
    SocialVeteran50000 Experience Points
    ISUFan22's Avatar
    Join Date
    Apr 2006
    Location
    Denver, CO
    Posts
    33,320
    Points
    353,319
    Level
    100
    Thumbs Up
    Received: 1,086
    Given: 626

    Re: JT update 06/17

    Thanks for the update and photos!



  3. #3
    All-Star
    Points: 25,375, Level: 48
    Level completed: 83%, Points required for next Level: 175
    Overall activity: 0%
    Achievements:
    SocialVeteran25000 Experience Points
    isugcs's Avatar
    Join Date
    Feb 2007
    Location
    Waverly
    Posts
    1,608
    Points
    25,375
    Level
    48
    Thumbs Up
    Received: 10
    Given: 116

    Re: JT update 06/17

    Good to see progress, thanks for the update.



  4. #4
    All-Star Achievements:
    Veteran10000 Experience Points
    bmuff's Avatar
    Join Date
    Apr 2006
    Posts
    1,583
    Thumbs Up
    Received: 0
    Given: 0

    Re: JT update 06/17

    Thanks for the update and photos. What are they going to use to pave the concourse? Asphault or cement? Or are they going to use brick? What about the ramp going up from the gate to the concourse?


    XXXX Master Shake is under gag order XXXX

  5. #5
    Pro
    Points: 43,696, Level: 64
    Level completed: 58%, Points required for next Level: 554
    Overall activity: 6.0%
    Achievements:
    Veteran25000 Experience Points
    TheHelgo's Avatar
    Join Date
    Mar 2006
    Location
    St. Louis, MO
    Posts
    2,827
    Points
    43,696
    Level
    64
    Thumbs Up
    Received: 31
    Given: 119

    Re: JT update 06/17

    thanks for the update.
    would it be possible for someone to go over and get some shots of the west side - i'm curious to see the new suites and concessions.



  6. #6
    Addict
    Points: 148,628, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 1.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience Points
    jaretac's Avatar
    Join Date
    Nov 2006
    Location
    Frigidaire
    Posts
    7,643
    Points
    148,628
    Level
    100
    Thumbs Up
    Received: 5
    Given: 0

    Re: JT update 06/17

    Here is the web cam for the back wall of the west side concession stands: WebCam - Jack Trice Stadium - Improvements 2006. I'll see want I can come up with later this week and will add it to the original post above. Also, the first two pictures are of the west concourse concessions.



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • TV: Cyclones.TV
  • FOOTBALL: Iowa State vs. UNI
  • September 5, 2015
  • 07:00 PM