Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED - Page 12
Page 12 of 43 FirstFirst ... 2891011121314151622 ... LastLast
Results 166 to 180 of 633
  1. #166
    Legend
    Points: 311,386, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 99.9%
    Achievements:
    50000 Experience PointsVeteranOverdrive
    00clone's Avatar
    Join Date
    Apr 2011
    Location
    Iowa City area
    Posts
    10,670
    Points
    311,386
    Level
    100
    Thumbs Up
    Received: 2,579
    Given: 613

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by ISUCyclones2015 View Post
    It is a clean way to present them though...

    I think he was just trying to come up with a response to make it seem like he knew those weren't just black pieces of plywood with I-State logos painted on them.




    Quote Originally Posted by cowgirl836
    moar yoga pants, please.

  2. #167
    All-Star
    Points: 25,872, Level: 49
    Level completed: 33%, Points required for next Level: 678
    Overall activity: 6.0%
    Achievements:
    Veteran25000 Experience Points
    F5cy's Avatar
    Join Date
    May 2011
    Location
    Washington, D.C.
    Posts
    1,200
    Points
    25,872
    Level
    49
    Thumbs Up
    Received: 180
    Given: 77

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Wasn't it mentioned at one point in time that students would be relocated to the south endzone?



  3. #168
    Speechless
    Points: 189,805, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 12.0%
    Achievements:
    Veteran50000 Experience Points
    kingcy's Avatar
    Join Date
    Sep 2006
    Location
    Menlo, Iowa
    Posts
    17,868
    Points
    189,805
    Level
    100
    Thumbs Up
    Received: 283
    Given: 183

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by F5cy View Post
    Wasn't it mentioned at one point in time that students would be relocated to the south endzone?
    Not going to happen.


    The gap in our economy is between what we have and what we think we ought to have--and that is a moral problem, not an economic one. - Paul Heyne

  4. #169
    Bench Warmer
    Points: 4,382, Level: 19
    Level completed: 33%, Points required for next Level: 268
    Overall activity: 0%
    Achievements:
    1 year registered1000 Experience Points

    Join Date
    Nov 2012
    Location
    Cyclone country
    Posts
    297
    Points
    4,382
    Level
    19
    Thumbs Up
    Received: 73
    Given: 34

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Nothing special to add here just wanted to say I'm so ******* pumped to see this in person in 2015!!!!



  5. #170
    Bench Warmer
    Points: 10,600, Level: 31
    Level completed: 8%, Points required for next Level: 650
    Overall activity: 0%
    Achievements:
    10000 Experience PointsVeteran

    Join Date
    Nov 2011
    Posts
    230
    Points
    10,600
    Level
    31
    Thumbs Up
    Received: 1
    Given: 1

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by mustangcy View Post
    I'm thrilled that the response has been so positive. That's really all that matters...but the outside is glass...glass. Nebraska, KSU, OSU, pretty much everyone builds awesome stone entrances and we get a second coming of the Jacobson building. Ahh, I'm just disappointed. I thought the 2008 renderings were amazing, can't say I'm in love with what was released today. That said I'm sure I'll love everything when I walk in fall of 15'.

    the the glass design will integrate well with the Reiman Garden architecture.



  6. #171
    Hall-Of-Famer
    Points: 20,110, Level: 43
    Level completed: 29%, Points required for next Level: 640
    Overall activity: 37.0%
    Achievements:
    Recommendation Second Class3 months registered10000 Experience PointsSocial
    bigdaddykane's Avatar
    Join Date
    Mar 2014
    Location
    Ames
    Posts
    3,820
    Points
    20,110
    Level
    43
    Thumbs Up
    Received: 785
    Given: 477

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by F5cy View Post
    Wasn't it mentioned at one point in time that students would be relocated to the south endzone?
    umm no


    BDK
    Cyclone state

  7. #172
    Hall-Of-Famer
    Points: 98,630, Level: 97
    Level completed: 79%, Points required for next Level: 420
    Overall activity: 31.0%
    Achievements:
    Veteran50000 Experience Points
    ribsnwhiskey's Avatar
    Join Date
    Feb 2009
    Location
    Ames
    Posts
    4,747
    Points
    98,630
    Level
    97
    Thumbs Up
    Received: 908
    Given: 221

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by mustangcy View Post
    I'm thrilled that the response has been so positive. That's really all that matters...but the outside is glass...glass. Nebraska, KSU, OSU, pretty much everyone builds awesome stone entrances and we get a second coming of the Jacobson building. Ahh, I'm just disappointed. I thought the 2008 renderings were amazing, can't say I'm in love with what was released today. That said I'm sure I'll love everything when I walk in fall of 15'.
    So you wont be buying club seats, I take it?



  8. #173
    All-Star
    Points: 25,872, Level: 49
    Level completed: 33%, Points required for next Level: 678
    Overall activity: 6.0%
    Achievements:
    Veteran25000 Experience Points
    F5cy's Avatar
    Join Date
    May 2011
    Location
    Washington, D.C.
    Posts
    1,200
    Points
    25,872
    Level
    49
    Thumbs Up
    Received: 180
    Given: 77

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by kingcy View Post
    Not going to happen.
    Quote Originally Posted by bigdaddykane View Post
    umm no

    I'm sure it was at least mentioned, because there was talk about how the seating sections presently occupied by the students were more valuable than end zone seats. This may have been 5 years ago, but I'm 99% sure it was discussed.

    And I'm not suggesting this is what will happen now, with the current plan, especially considering the club being located there etc.. I just didn't know if it was possible students would be relocated to the corners perhaps?



  9. #174
    All-Star
    Points: 21,891, Level: 45
    Level completed: 27%, Points required for next Level: 659
    Overall activity: 8.0%
    Achievements:
    Veteran10000 Experience Points
    HGPuck's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    1,198
    Points
    21,891
    Level
    45
    Thumbs Up
    Received: 44
    Given: 0

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    It was discussed by fans on here, but confirmed by the AD that they won't be moving or at least that's not the plan. The only thing I could see being moved is the visitors section.
    Quote Originally Posted by F5cy View Post
    I'm sure it was at least mentioned, because there was talk about how the seating sections presently occupied by the students were more valuable than end zone seats. This may have been 5 years ago, but I'm 99% sure it was discussed.

    And I'm not suggesting this is what will happen now, with the current plan, especially considering the club being located there etc.. I just didn't know if it was possible students would be relocated to the corners perhaps?


    When all is said and done, more is said than done

  10. #175
    Pro
    Points: 38,826, Level: 60
    Level completed: 82%, Points required for next Level: 224
    Overall activity: 4.0%
    Achievements:
    25000 Experience PointsVeteran
    MaccloNe's Avatar
    Join Date
    Sep 2011
    Posts
    3,186
    Points
    38,826
    Level
    60
    Thumbs Up
    Received: 268
    Given: 27

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I hope this doesn't price me out of the ability to afford tickets.



  11. #176
    All-Star
    Points: 21,891, Level: 45
    Level completed: 27%, Points required for next Level: 659
    Overall activity: 8.0%
    Achievements:
    Veteran10000 Experience Points
    HGPuck's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    1,198
    Points
    21,891
    Level
    45
    Thumbs Up
    Received: 44
    Given: 0

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I would guess that the new upper deck corners will be at a similar price point to the current end zone seats.
    Quote Originally Posted by MaccloNe View Post
    I hope this doesn't price me out of the ability to afford tickets.


    When all is said and done, more is said than done

  12. #177
    Starter
    Points: 21,746, Level: 45
    Level completed: 11%, Points required for next Level: 804
    Overall activity: 8.0%
    Achievements:
    10000 Experience PointsVeteran
    jcisuclones's Avatar
    Join Date
    Nov 2011
    Location
    The Cyclone State
    Posts
    956
    Points
    21,746
    Level
    45
    Thumbs Up
    Received: 284
    Given: 597

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by F5cy View Post
    I'm sure it was at least mentioned, because there was talk about how the seating sections presently occupied by the students were more valuable than end zone seats. This may have been 5 years ago, but I'm 99% sure it was discussed.

    And I'm not suggesting this is what will happen now, with the current plan, especially considering the club being located there etc.. I just didn't know if it was possible students would be relocated to the corners perhaps?
    It was talked about a couple months ago after they got the donation, and it was a possibility. But now that they revealed that club seats would take up a good portion of that area, I can't see the students moving anytime soon.


    Iowa State Manchester United Pittsburgh Steelers

    "I want to see the arena filled, and I want other teams to dread coming to Ames." -Johnny Orr

  13. #178
    Addict
    Points: 114,068, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 19.0%
    Achievements:
    50000 Experience PointsVeteran
    CysRage's Avatar
    Join Date
    Oct 2009
    Posts
    6,508
    Points
    114,068
    Level
    100
    Thumbs Up
    Received: 695
    Given: 580

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by HGPuck View Post
    It was discussed by fans on here, but confirmed by the AD that they won't be moving or at least that's not the plan. The only thing I could see being moved is the visitors section.
    I really hope they do move the visitors section to one of the upper corners. Just about every other team gives their visitors the worst sections in the stadium but ISU has their visitor section in the lower bowl.


    "The greatest risk in life is not taking one"

  14. #179
    Hall-Of-Famer
    Points: 49,545, Level: 68
    Level completed: 86%, Points required for next Level: 205
    Overall activity: 17.0%
    Achievements:
    Veteran25000 Experience Points

    Join Date
    Jul 2008
    Location
    Wichita, KS
    Posts
    3,865
    Points
    49,545
    Level
    68
    Thumbs Up
    Received: 130
    Given: 13

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I can't think of one stadium that doesn't have a lower bowl visitor section...



  15. #180
    All-Star
    Points: 19,757, Level: 42
    Level completed: 90%, Points required for next Level: 93
    Overall activity: 12.0%
    Achievements:
    1 year registered10000 Experience Points
    Skidoosh's Avatar
    Join Date
    May 2012
    Posts
    1,542
    Points
    19,757
    Level
    42
    Thumbs Up
    Received: 471
    Given: 141

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by mustangcy View Post
    I'm thrilled that the response has been so positive. That's really all that matters...but the outside is glass...glass. Nebraska, KSU, OSU, pretty much everyone builds awesome stone entrances and we get a second coming of the Jacobson building. Ahh, I'm just disappointed. I thought the 2008 renderings were amazing, can't say I'm in love with what was released today. That said I'm sure I'll love everything when I walk in fall of 15'.
    I'd rather we make a unique, modern look than try and compete using the same materials against schools with much more money backing.



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • TV: Cyclones.tv
  • HOOPS: Iowa State vs. Mississippi Valley State
  • December 31, 2014
  • 06:00 PM