Page 12 of 44 FirstFirst ... 2891011121314151622 ... LastLast
Results 166 to 180 of 655
  1. #166
    Legend
    Points: 346,880, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 99.6%
    Achievements:
    50000 Experience PointsVeteranOverdrive
    00clone's Avatar
    Join Date
    Apr 2011
    Location
    Iowa City area
    Posts
    13,119
    Points
    346,880
    Level
    100
    Thumbs Up
    Received: 3,890
    Given: 1,003

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by ISUCyclones2015 View Post
    It is a clean way to present them though...

    I think he was just trying to come up with a response to make it seem like he knew those weren't just black pieces of plywood with I-State logos painted on them.



    Quote Originally Posted by cowgirl836
    moar yoga pants, please.

  2. #167
    All-Star
    Points: 29,748, Level: 52
    Level completed: 99%, Points required for next Level: 2
    Overall activity: 13.0%
    Achievements:
    Veteran25000 Experience Points
    F5cy's Avatar
    Join Date
    May 2011
    Location
    Washington, D.C.
    Posts
    1,314
    Points
    29,748
    Level
    52
    Thumbs Up
    Received: 241
    Given: 100

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Wasn't it mentioned at one point in time that students would be relocated to the south endzone?



  3. #168
    Speechless
    Points: 192,930, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 49.0%
    Achievements:
    Veteran50000 Experience Points
    kingcy's Avatar
    Join Date
    Sep 2006
    Location
    Menlo, Iowa
    Posts
    18,440
    Points
    192,930
    Level
    100
    Thumbs Up
    Received: 478
    Given: 404

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by F5cy View Post
    Wasn't it mentioned at one point in time that students would be relocated to the south endzone?
    Not going to happen.


    The gap in our economy is between what we have and what we think we ought to have--and that is a moral problem, not an economic one. - Paul Heyne

  4. #169
    Starter
    Points: 10,992, Level: 31
    Level completed: 64%, Points required for next Level: 258
    Overall activity: 6.0%
    Achievements:
    1 year registeredCreated Album pictures10000 Experience Points
    HitItHard58's Avatar
    Join Date
    Nov 2012
    Location
    Cyclone Country (Roland)
    Posts
    614
    Points
    10,992
    Level
    31
    Thumbs Up
    Received: 180
    Given: 157

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Nothing special to add here just wanted to say I'm so ******* pumped to see this in person in 2015!!!!



  5. #170
    Bench Warmer
    Points: 10,945, Level: 31
    Level completed: 57%, Points required for next Level: 305
    Overall activity: 0%
    Achievements:
    10000 Experience PointsVeteran

    Join Date
    Nov 2011
    Posts
    239
    Points
    10,945
    Level
    31
    Thumbs Up
    Received: 6
    Given: 3

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by mustangcy View Post
    I'm thrilled that the response has been so positive. That's really all that matters...but the outside is glass...glass. Nebraska, KSU, OSU, pretty much everyone builds awesome stone entrances and we get a second coming of the Jacobson building. Ahh, I'm just disappointed. I thought the 2008 renderings were amazing, can't say I'm in love with what was released today. That said I'm sure I'll love everything when I walk in fall of 15'.

    the the glass design will integrate well with the Reiman Garden architecture.



  6. #171
    Addict
    Points: 34,020, Level: 56
    Level completed: 81%, Points required for next Level: 230
    Overall activity: 1.0%
    Achievements:
    Recommendation Second ClassSocial25000 Experience Points1 year registered

    Join Date
    Mar 2014
    Posts
    5,589
    Points
    34,020
    Level
    56
    Thumbs Up
    Received: 1,122
    Given: 749

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by F5cy View Post
    Wasn't it mentioned at one point in time that students would be relocated to the south endzone?
    umm no


    BDK
    Cyclone state
    "Some fans show up for big games, our fans show up for every game,” Hoiberg said.

  7. #172
    Addict
    Points: 100,576, Level: 98
    Level completed: 77%, Points required for next Level: 474
    Overall activity: 20.0%
    Achievements:
    Veteran50000 Experience Points
    ribsnwhiskey's Avatar
    Join Date
    Feb 2009
    Location
    Ames
    Posts
    5,020
    Points
    100,576
    Level
    98
    Thumbs Up
    Received: 1,114
    Given: 269

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by mustangcy View Post
    I'm thrilled that the response has been so positive. That's really all that matters...but the outside is glass...glass. Nebraska, KSU, OSU, pretty much everyone builds awesome stone entrances and we get a second coming of the Jacobson building. Ahh, I'm just disappointed. I thought the 2008 renderings were amazing, can't say I'm in love with what was released today. That said I'm sure I'll love everything when I walk in fall of 15'.
    So you wont be buying club seats, I take it?



  8. #173
    All-Star
    Points: 29,748, Level: 52
    Level completed: 99%, Points required for next Level: 2
    Overall activity: 13.0%
    Achievements:
    Veteran25000 Experience Points
    F5cy's Avatar
    Join Date
    May 2011
    Location
    Washington, D.C.
    Posts
    1,314
    Points
    29,748
    Level
    52
    Thumbs Up
    Received: 241
    Given: 100

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by kingcy View Post
    Not going to happen.
    Quote Originally Posted by bigdaddykane View Post
    umm no

    I'm sure it was at least mentioned, because there was talk about how the seating sections presently occupied by the students were more valuable than end zone seats. This may have been 5 years ago, but I'm 99% sure it was discussed.

    And I'm not suggesting this is what will happen now, with the current plan, especially considering the club being located there etc.. I just didn't know if it was possible students would be relocated to the corners perhaps?



  9. #174
    All-Star
    Points: 25,021, Level: 48
    Level completed: 48%, Points required for next Level: 529
    Overall activity: 12.0%
    Achievements:
    Veteran25000 Experience Points
    HGPuck's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    1,366
    Points
    25,021
    Level
    48
    Thumbs Up
    Received: 107
    Given: 1

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    It was discussed by fans on here, but confirmed by the AD that they won't be moving or at least that's not the plan. The only thing I could see being moved is the visitors section.
    Quote Originally Posted by F5cy View Post
    I'm sure it was at least mentioned, because there was talk about how the seating sections presently occupied by the students were more valuable than end zone seats. This may have been 5 years ago, but I'm 99% sure it was discussed.

    And I'm not suggesting this is what will happen now, with the current plan, especially considering the club being located there etc.. I just didn't know if it was possible students would be relocated to the corners perhaps?


    When all is said and done, more is said than done

  10. #175
    Pro
    Points: 41,860, Level: 63
    Level completed: 17%, Points required for next Level: 1,090
    Overall activity: 10.0%
    Achievements:
    25000 Experience PointsVeteran
    MaccloNe's Avatar
    Join Date
    Sep 2011
    Posts
    3,341
    Points
    41,860
    Level
    63
    Thumbs Up
    Received: 328
    Given: 27

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I hope this doesn't price me out of the ability to afford tickets.



  11. #176
    All-Star
    Points: 25,021, Level: 48
    Level completed: 48%, Points required for next Level: 529
    Overall activity: 12.0%
    Achievements:
    Veteran25000 Experience Points
    HGPuck's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    1,366
    Points
    25,021
    Level
    48
    Thumbs Up
    Received: 107
    Given: 1

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I would guess that the new upper deck corners will be at a similar price point to the current end zone seats.
    Quote Originally Posted by MaccloNe View Post
    I hope this doesn't price me out of the ability to afford tickets.


    When all is said and done, more is said than done

  12. #177
    All-Star
    Points: 41,879, Level: 63
    Level completed: 18%, Points required for next Level: 1,071
    Overall activity: 1.0%
    Achievements:
    Veteran25000 Experience Points
    jcisuclones's Avatar
    Join Date
    Nov 2011
    Location
    The Cyclone State
    Posts
    1,325
    Points
    41,879
    Level
    63
    Thumbs Up
    Received: 556
    Given: 872

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by F5cy View Post
    I'm sure it was at least mentioned, because there was talk about how the seating sections presently occupied by the students were more valuable than end zone seats. This may have been 5 years ago, but I'm 99% sure it was discussed.

    And I'm not suggesting this is what will happen now, with the current plan, especially considering the club being located there etc.. I just didn't know if it was possible students would be relocated to the corners perhaps?
    It was talked about a couple months ago after they got the donation, and it was a possibility. But now that they revealed that club seats would take up a good portion of that area, I can't see the students moving anytime soon.


    Iowa State Manchester United Pittsburgh Steelers

    "I want to see the arena filled, and I want other teams to dread coming to Ames." -Johnny Orr

  13. #178
    Addict
    Points: 136,354, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 34.0%
    Achievements:
    50000 Experience PointsVeteran
    CysRage's Avatar
    Join Date
    Oct 2009
    Location
    Cedar Rapids, IA
    Posts
    7,202
    Points
    136,354
    Level
    100
    Thumbs Up
    Received: 1,026
    Given: 879

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by HGPuck View Post
    It was discussed by fans on here, but confirmed by the AD that they won't be moving or at least that's not the plan. The only thing I could see being moved is the visitors section.
    I really hope they do move the visitors section to one of the upper corners. Just about every other team gives their visitors the worst sections in the stadium but ISU has their visitor section in the lower bowl.


    "The greatest risk in life is not taking one"

  14. #179
    Hall-Of-Famer
    Points: 53,922, Level: 71
    Level completed: 92%, Points required for next Level: 128
    Overall activity: 40.0%
    Achievements:
    Veteran50000 Experience Points

    Join Date
    Jul 2008
    Location
    Cedar Rapids
    Posts
    4,705
    Points
    53,922
    Level
    71
    Thumbs Up
    Received: 489
    Given: 65

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I can't think of one stadium that doesn't have a lower bowl visitor section...



  15. #180
    All-Star
    Points: 25,832, Level: 49
    Level completed: 29%, Points required for next Level: 718
    Overall activity: 32.0%
    Achievements:
    Veteran25000 Experience Points
    Skidoosh's Avatar
    Join Date
    May 2012
    Posts
    1,835
    Points
    25,832
    Level
    49
    Thumbs Up
    Received: 652
    Given: 228

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by mustangcy View Post
    I'm thrilled that the response has been so positive. That's really all that matters...but the outside is glass...glass. Nebraska, KSU, OSU, pretty much everyone builds awesome stone entrances and we get a second coming of the Jacobson building. Ahh, I'm just disappointed. I thought the 2008 renderings were amazing, can't say I'm in love with what was released today. That said I'm sure I'll love everything when I walk in fall of 15'.
    I'd rather we make a unique, modern look than try and compete using the same materials against schools with much more money backing.



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • TV: TBD
  • FOOTBALL: Iowa State vs. UNI
  • August 29, 2015
  • 06:00 PM