Page 1 of 35 1234511 ... LastLast
Results 1 to 15 of 511
  1. #1
    Publisher
    Points: 786,574, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 99.4%
    Achievements:
    SocialRecommendation First ClassVeteranCreated Album pictures50000 Experience Points
    ChrisMWilliams's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    16,052
    Points
    786,574
    Level
    100
    Thumbs Up
    Received: 725
    Given: 189

    Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    AMES, Iowa –The Iowa State Athletics Department released Monday architectural sketches for its south end zone project at Jack Trice Stadium. Plans and schematic designs for the first phase of the construction will go to the Board of Regents, State of Iowa, for final approval on June 5.

    The initial phase of the renovation will close in the south end zone at the stadium with a permanent upper and lower seating bowl. That structure will house a new two-story premium club space, include an additional HD-quality video board / sound system and connect the east and west concourses. Stadium capacity will exceed 61,000 upon completion of the project in August, 2015.

    “The atmosphere of an enclosed stadium – supported by a huge video board at each end of the stadium – will significantly enhance the game day experience,” Iowa State Director of Athletics Jamie Pollard said. “This project will also enrich the presence/entrance of Reiman Gardens, an award-winning garden and conservatory located south of the stadium.”

    The south end zone construction will functionally connect the east and west sides of the stadium to create a singular concourse experience for fans. In addition to the new club section, there will be more permanent seat location options and price points for fan consideration.

    The glass facades of the club’s upper level will look into the stadium bowl (north) and out toward Reiman Gardens (south). The construction will create a much-improved arrival experience into campus for visitors to Iowa State University and dramatically impact the look and feel of a Cyclone football game day.

    “This project has multiple benefits for the institution, the athletics department and the football program,” Pollard said. “There will be a significantly enhanced main entrance to campus, capitalizing on a natural symmetry between Jack Trice Stadium and Reiman Gardens, two university landmarks. Additionally, there will be a dramatically improved game atmosphere with the closed-in end zone.”

    In addition to the stadium renovation, Iowa State officials continue to review concepts for a second phase of the project which will include improvements to the parking and green space areas adjacent to the facility. Those project specifics will be presented to the Board of Regents at a later date. The stadium renovation plus the parking and green space enhancements are all part of a $60 million upgrade to the primary campus entrance and football facility.

    The architect of record for the project is Neumann Monson Architects (Des Moines) and the sports architect is HNTB Architecture (Kansas City).



  2. #2
    Addict
    Points: 143,066, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 55.0%
    Achievements:
    50000 Experience PointsVeteran
    theantiAIRBHG's Avatar
    Join Date
    May 2011
    Location
    Hiawatha, IA
    Posts
    7,645
    Points
    143,066
    Level
    100
    Thumbs Up
    Received: 638
    Given: 612

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Pretty cool stuff. A defined main entrance can do wonders for the appearance of a stadium. I think the new entrance at Kinnick they did a few years ago really gave it a facelift. Sounds like this project will really enhance JT.



    Follow me on Twitter: @theantiAIRBHG

  3. #3
    Starter
    Points: 7,752, Level: 26
    Level completed: 34%, Points required for next Level: 398
    Overall activity: 81.0%
    Achievements:
    5000 Experience Points1 year registered

    Join Date
    Jun 2013
    Location
    IA City
    Posts
    736
    Points
    7,752
    Level
    26
    Thumbs Up
    Received: 78
    Given: 0

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Sounds Awesome...photos? Also, I'm shocked they aren't trying to include a new press box. That thing will look so out of place when all is done. There are High School press boxes that are larger.



  4. #4
    Addict
    Points: 154,404, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 32.0%
    Achievements:
    Veteran50000 Experience Points
    Clonefan32's Avatar
    Join Date
    Nov 2008
    Posts
    8,655
    Points
    154,404
    Level
    100
    Thumbs Up
    Received: 553
    Given: 7

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I'll admit I haven't followed the SEZ stuff as much as others, but has that 61,000 figure been out there for a while? That seems just about right to me.



  5. #5
    Publisher
    Points: 786,574, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 99.4%
    Achievements:
    SocialRecommendation First ClassVeteranCreated Album pictures50000 Experience Points
    ChrisMWilliams's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    16,052
    Points
    786,574
    Level
    100
    Thumbs Up
    Received: 725
    Given: 189

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    I've got like 5 photos. Creating a giant front page article with all in there. Until then, more facts.

    Break Ground: Summer, 2014

    Project Completion: August, 2015

    Architects: Neumann Monson Architects & HNTB Architecture

    Construction Manager: The Weitz Company

    New Stadium Capacity: 61,000

    Size of “End Zone Club”: approximately 40,000 square feet (two levels)

    Lower Bowl SEZ Seating Capacity: 7,500 (includes 3,000 club seats)

    Upper Bowl SEZ Seating Capacity: 5,800

    Video Board Structure: 150’ by 36’ (similar to current board in NEZ)

    Additional Restrooms: 133 female, 82 male



  6. #6
    Publisher
    Points: 786,574, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 99.4%
    Achievements:
    SocialRecommendation First ClassVeteranCreated Album pictures50000 Experience Points
    ChrisMWilliams's Avatar
    Join Date
    Apr 2006
    Location
    Des Moines
    Posts
    16,052
    Points
    786,574
    Level
    100
    Thumbs Up
    Received: 725
    Given: 189

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Tickets...


    End Zone Club

    The End Zone Club will be a 3,000-seat outdoor premium seating area in the south end zone of Jack Trice Stadium. It will debut in the 2015 football season.

    Amenities and Benefits

    • Outdoor chair-back seats with cup holders
    • Access to a climate-controlled two-level lounge area (top floor looks into stadium)
    • High-definition televisions and game audio in lounge areas
    • Access to gameday-themed ala carte cash food stations
    • Access to full-service cash bar (mixed drinks, beer and wine)
    • Access to private restrooms within club lounge area
    • Opportunity to purchase a priority parking pass with annual Cyclone Club donation



    End Zone Club annual contribution and ticket prices

    The Iowa State Athletics Department is in the process of reviewing annual donation levels and benefits. The number of End Zone Club seats that can be purchased will be based on an individual’s annual Cyclone Club giving level.

    The annual cost for season tickets in the End Zone Club is $750 each.

    *Annual donation requirements and ticket limits are TBD. The season ticket price for the End Zone Club is subject to change.


    How do I secure my End Zone Club seats?

    Information on the new End Zone Club section, as well as other seating options for 2015, will be sent to all Cyclone Club members and season ticketholders later this summer.


    • All current football season ticketholders will be given first opportunity to purchase seats in new End Zone Club. Season ticketholders who currently have seats in the south end zone, will have first priority for End Zone Club seat locations OR they will be given first rights to re-locate to other seating sections in the new south end zone bowl of Jack Trice Stadium.



    • Non-season ticketholders, who are interested in purchasing new End Zone Club seats, can fill out an interest form (click here). Those fans, who submit an interest form, will be contacted in late summer/fall (2014) with more information on seating options.


    All End Zone Club seats are based on availability. Seats will be allocated in order according to Cyclone Club donation level and a donor’s priority points within that level.



  7. #7
    Addict
    Points: 131,735, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 23.0%
    Achievements:
    50000 Experience PointsSocialVeteran
    ISUCyclones2015's Avatar
    Join Date
    Dec 2010
    Location
    Ames via Akron, Ohio
    Posts
    5,423
    Points
    131,735
    Level
    100
    Thumbs Up
    Received: 406
    Given: 139

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    My teams: (as of 6/15/14)
    Cleveland Browns: 4-12 - .250
    Cleveland Indians: 34-35 - .493
    Cleveland Cavs: 33-49 - .402
    Iowa State Cyclones (FB): 3-9 - .250
    Iowa State Cyclones (BB): 28-8 - .778



  8. #8
    Addict
    Points: 154,404, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 32.0%
    Achievements:
    Veteran50000 Experience Points
    Clonefan32's Avatar
    Join Date
    Nov 2008
    Posts
    8,655
    Points
    154,404
    Level
    100
    Thumbs Up
    Received: 553
    Given: 7

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Wow. Another scoreboard like the one we have?



  9. #9
    Speechless
    Points: 861,175, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 100.0%
    Achievements:
    SocialVeteranCreated Album pictures50000 Experience PointsOverdrive
    CycloneErik's Avatar
    Join Date
    Jan 2008
    Location
    Jamerica
    Posts
    55,576
    Points
    861,175
    Level
    100
    Thumbs Up
    Received: 1,597
    Given: 1,350

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by Clonefan32 View Post
    I'll admit I haven't followed the SEZ stuff as much as others, but has that 61,000 figure been out there for a while? That seems just about right to me.
    Over 60k has been out for a while.

    For whoever remembers, doesn't that put our stadium right around 3-5th in the Big 12 for capacity?


    Since we are an elite team now, let's go get that One Cyclone Moment.
    Make this one for the ages!




    http://rememberingdoria.wordpress.com/

  10. #10
    Rookie
    Points: 17,032, Level: 39
    Level completed: 73%, Points required for next Level: 218
    Overall activity: 1.0%
    Achievements:
    SocialVeteran10000 Experience Points
    clonefromNE's Avatar
    Join Date
    Oct 2006
    Location
    Lawrence
    Posts
    451
    Points
    17,032
    Level
    39
    Thumbs Up
    Received: 1
    Given: 15

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Construction starting summer 2014. I wonder if the south entrance (not seating) will be closed for the 2014 season?

    Will people have to enter through the other gates?


    "You can observe a lot by watching" ~Yogi Berra

  11. #11
    Addict
    Points: 131,735, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 23.0%
    Achievements:
    50000 Experience PointsSocialVeteran
    ISUCyclones2015's Avatar
    Join Date
    Dec 2010
    Location
    Ames via Akron, Ohio
    Posts
    5,423
    Points
    131,735
    Level
    100
    Thumbs Up
    Received: 406
    Given: 139

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Quote Originally Posted by CycloneErik View Post
    Over 60k has been out for a while.

    For whoever remembers, doesn't that put our stadium right around 3-5th in the Big 12 for capacity?
    It is 61k and we will be #3 if we hit 61k.


    My teams: (as of 6/15/14)
    Cleveland Browns: 4-12 - .250
    Cleveland Indians: 34-35 - .493
    Cleveland Cavs: 33-49 - .402
    Iowa State Cyclones (FB): 3-9 - .250
    Iowa State Cyclones (BB): 28-8 - .778



  12. #12
    Addict
    Points: 131,735, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 23.0%
    Achievements:
    50000 Experience PointsSocialVeteran
    ISUCyclones2015's Avatar
    Join Date
    Dec 2010
    Location
    Ames via Akron, Ohio
    Posts
    5,423
    Points
    131,735
    Level
    100
    Thumbs Up
    Received: 406
    Given: 139

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Also... BEER/DRINKS SERVED!


    My teams: (as of 6/15/14)
    Cleveland Browns: 4-12 - .250
    Cleveland Indians: 34-35 - .493
    Cleveland Cavs: 33-49 - .402
    Iowa State Cyclones (FB): 3-9 - .250
    Iowa State Cyclones (BB): 28-8 - .778



  13. #13
    Addict
    Points: 154,404, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 32.0%
    Achievements:
    Veteran50000 Experience Points
    Clonefan32's Avatar
    Join Date
    Nov 2008
    Posts
    8,655
    Points
    154,404
    Level
    100
    Thumbs Up
    Received: 553
    Given: 7

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    One thing I'm confused on is exactly where these outdoor Club seats will be. In the existing endzone seats?



  14. #14
    Speechless
    Points: 646,959, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 58.0%
    Achievements:
    50000 Experience PointsVeteranOverdrive
    3TrueFans's Avatar
    Join Date
    Sep 2009
    Location
    Ames
    Posts
    23,881
    Points
    646,959
    Level
    100
    Thumbs Up
    Received: 1,505
    Given: 143

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Well that looks ******* awesome.




  15. #15
    Addict
    Points: 131,735, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 23.0%
    Achievements:
    50000 Experience PointsSocialVeteran
    ISUCyclones2015's Avatar
    Join Date
    Dec 2010
    Location
    Ames via Akron, Ohio
    Posts
    5,423
    Points
    131,735
    Level
    100
    Thumbs Up
    Received: 406
    Given: 139

    Re: Release: SCHEMATIC DESIGNS FOR SOUTH END ZONE PROJECT RELEASED

    Oh man I wish I knew where I was gonna be working full-time. If it is Des Moines/Minneapolis/Iowa area... I would totally get Season Tickets in the endzone but I can't commit this early


    My teams: (as of 6/15/14)
    Cleveland Browns: 4-12 - .250
    Cleveland Indians: 34-35 - .493
    Cleveland Cavs: 33-49 - .402
    Iowa State Cyclones (FB): 3-9 - .250
    Iowa State Cyclones (BB): 28-8 - .778



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • TV: Fox Sports 1
  • Iowa State vs. Kansas State
  • September 6, 2014
  • 11:00 AM