    FB Facility

    Someone explain how if we are this far March 1 how we're not in before the season starts? Who's a CE here?



  2. #2
    Speechless
    Points: 450,197, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 1.0%
    Achievements:
    SocialRecommendation Second ClassVeteranCreated Album pictures50000 Experience Points

    Join Date
    Nov 2007
    Location
    Rochester, MN
    Posts
    24,864
    Points
    450,197
    Level
    100
    Thumbs Up
    Received: 742
    Given: 277

    Re: FB Facility

    Well, they've had the outside shell done for State Gym for about a year now and it STILL isn't done. I'm not a ConE by any stretch of the imagination, but it isn't as crazy as it sounds.



  3. #3
    Pro
    Points: 33,329, Level: 56
    Level completed: 24%, Points required for next Level: 921
    Overall activity: 0%
    Achievements:
    SocialRecommendation Second ClassVeteran25000 Experience Points
    scottie33's Avatar
    Join Date
    Nov 2006
    Location
    Ames, Iowa
    Posts
    2,646
    Points
    33,329
    Level
    56
    Thumbs Up
    Received: 37
    Given: 0

    Re: FB Facility

    Quote Originally Posted by Im4State View Post
    Someone explain how if we are this far March 1 how we're not in before the season starts? Who's a CE here?

    First off a CE is NOT a ConE...different role, different major, different responsibilities.



  4. #4
    Pro
    Points: 62,404, Level: 77
    Level completed: 48%, Points required for next Level: 846
    Overall activity: 0%
    Achievements:
    Veteran50000 Experience Points

    Join Date
    Nov 2008
    Posts
    2,379
    Points
    62,404
    Level
    77
    Thumbs Up
    Received: 292
    Given: 151

    Re: FB Facility

    Quote Originally Posted by scottie33 View Post
    First off a CE is NOT a ConE...different role, different major, different responsibilities.
    This. A Con E is like a CE, except without the hard classes :P



  5. #5
    Pro
    Points: 33,329, Level: 56
    Level completed: 24%, Points required for next Level: 921
    Overall activity: 0%
    Achievements:
    SocialRecommendation Second ClassVeteran25000 Experience Points
    scottie33's Avatar
    Join Date
    Nov 2006
    Location
    Ames, Iowa
    Posts
    2,646
    Points
    33,329
    Level
    56
    Thumbs Up
    Received: 37
    Given: 0

    Re: FB Facility

    Looks like from the picture that the roofing system is starting at the South and working to the North. Weather dependent, roofing activity will be complete 4-8weeks without delay from other trades is my guess with detailing of parapets, canopies, etc.

    They do have temporary winter protection in place and I haven't seen the webcam since precast and steel erection began so I don't know if they have been doing underground MEP work or not. This will have to be completed before concrete slab-on-grade is placed which needs tempered air (hence the winter protection, and probably several heaters inside).

    I just looked at the daily photos and I'm guessing underground MEP work is progressing and/or slab-on-grade prep under the roof deck/enclosed area.

    There's still over 1/2 the building that looks like it needs to be erected.

    The best thing for the progress of this construction for the cold and wet conditions (unpredictable) to cease. As erection of structural steel and precast, floor deck, roof deck progress more area can be enclosed and protected from the elements if need be. Obviously, warmer and drier conditions will allow for slab on deck to be poured, they are still a few weeks out from that it appears no 2nd level floor deck is placed and thus no MEP rough-in on floor deck is complete.

    Work will be done by football season I know, they always are! It may be a lot of extra hours and overtime, but it WILL be complete.



  6. #6
    Pro
    Points: 33,329, Level: 56
    Level completed: 24%, Points required for next Level: 921
    Overall activity: 0%
    Achievements:
    SocialRecommendation Second ClassVeteran25000 Experience Points
    scottie33's Avatar
    Join Date
    Nov 2006
    Location
    Ames, Iowa
    Posts
    2,646
    Points
    33,329
    Level
    56
    Thumbs Up
    Received: 37
    Given: 0

    Re: FB Facility

    Civil Engineers design, Construction Engineers build what the CE designs. In some cases, like now we have a ISU CE grad working for a general contractor handling all the tasks associated with steel (scheduling, procurement, problems).

    FYI, the Structural Engineer of Record for the Scoreboard is the Structural Engineer of Record for the Football Practice Facility I believe.



  7. #7
    Bench Warmer
    Points: 10,745, Level: 31
    Level completed: 28%, Points required for next Level: 505
    Overall activity: 0%
    Achievements:
    Veteran10000 Experience Points
    Im4State's Avatar
    Join Date
    Oct 2009
    Location
    Clive
    Posts
    233
    Points
    10,745
    Level
    31
    Thumbs Up
    Received: 20
    Given: 26

    Re: FB Facility

    gotcha... yeah my buddy is a ConE and I knew several of them in college. Couldn't remember the damn abbr. Thanks



  8. #8
    Pro
    Points: 38,013, Level: 60
    Level completed: 14%, Points required for next Level: 1,037
    Overall activity: 1.0%
    Achievements:
    Veteran25000 Experience Points
    Rods79's Avatar
    Join Date
    Nov 2006
    Location
    Des Moines
    Posts
    2,563
    Points
    38,013
    Level
    60
    Thumbs Up
    Received: 26
    Given: 17

    Re: FB Facility

    One would think that we are just getting into March and they shouldn't be too far behind due to weather related issues. Iowa typically has snow/wet conditions all the way through April. That should have been taken into account when planning the construction schedule last spring.

    ...although I'm not in Iowa currently, so I have no idea what the weather is like, and I'm not a ConE (although I'm still in the building industry)...

    I have a feeling that most projects get hung up on some sort of domino effect due to a tight initial construction schedule that may then be exasperated by weather.



  9. #9
    Starter
    Points: 15,701, Level: 38
    Level completed: 7%, Points required for next Level: 749
    Overall activity: 0%
    Achievements:
    10000 Experience PointsVeteran

    Join Date
    May 2010
    Location
    Ankeny, IA
    Posts
    706
    Points
    15,701
    Level
    38
    Thumbs Up
    Received: 65
    Given: 50

    Re: FB Facility

    I'm not going to say they won't have it completed by this fall, but there is only one small portion of the building that is completely enclosed at this point. Even once they have the entire building enclosed, it's still going to take a long time to get the inside complete.

    If you've ever seen a house built it's amazing how quickly the framing is done and the exterior can look complete. It's that pesky detail work, that makes it look good, that takes so long.



  10. #10
    Addict
    Points: 117,811, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 0%
    Achievements:
    SocialVeteran50000 Experience Points
    madcityCY's Avatar
    Join Date
    Nov 2006
    Location
    Madison, WI
    Posts
    5,902
    Points
    117,811
    Level
    100
    Thumbs Up
    Received: 195
    Given: 403

    Re: FB Facility

    The shell of the building goes up relatively quickly, as they want to get it enclosed so they can have some environmental control. Mechanical, Electrical, Plumbing and finish work take longer than you think.

    Suddenly there are more trades on site to manage and work around each other, lots of small scale things to build.



  11. #11
    Starter
    Points: 21,209, Level: 44
    Level completed: 51%, Points required for next Level: 441
    Overall activity: 0%
    Achievements:
    Veteran10000 Experience Points
    Cyfan4good's Avatar
    Join Date
    Jul 2009
    Location
    Ankeny
    Posts
    688
    Points
    21,209
    Level
    44
    Thumbs Up
    Received: 39
    Given: 41

    Re: FB Facility

    Quote Originally Posted by scottie33 View Post
    Looks like from the picture that the roofing system is starting at the South and working to the North. Weather dependent, roofing activity will be complete 4-8weeks without delay from other trades is my guess with detailing of parapets, canopies, etc.

    They do have temporary winter protection in place and I haven't seen the webcam since precast and steel erection began so I don't know if they have been doing underground MEP work or not. This will have to be completed before concrete slab-on-grade is placed which needs tempered air (hence the winter protection, and probably several heaters inside).

    I just looked at the daily photos and I'm guessing underground MEP work is progressing and/or slab-on-grade prep under the roof deck/enclosed area.

    There's still over 1/2 the building that looks like it needs to be erected.

    The best thing for the progress of this construction for the cold and wet conditions (unpredictable) to cease. As erection of structural steel and precast, floor deck, roof deck progress more area can be enclosed and protected from the elements if need be. Obviously, warmer and drier conditions will allow for slab on deck to be poured, they are still a few weeks out from that it appears no 2nd level floor deck is placed and thus no MEP rough-in on floor deck is complete.

    Work will be done by football season I know, they always are! It may be a lot of extra hours and overtime, but it WILL be complete.

    Is this post anywhere close to a site record?



  12. #12
    Legend
    Points: 191,697, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 4.0%
    Achievements:
    50000 Experience PointsVeteran
    Rhoadhoused's Avatar
    Join Date
    Apr 2010
    Location
    Ames, IA
    Posts
    11,200
    Points
    191,697
    Level
    100
    Thumbs Up
    Received: 1,508
    Given: 777

    Re: FB Facility

    Quote Originally Posted by Cyfan4good View Post
    Is this post anywhere close to a site record?
    Did you read the thread with the live video of the top of the scoreboard going up? It was 3 hours of 200 people making erection jokes while the scoreboard moved about an inch a minute.



  13. #13
    Speechless
    Points: 592,255, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 1.0%
    Achievements:
    Social50000 Experience PointsOverdriveVeteranRecommendation Second Class
    ISUAgronomist's Avatar
    Join Date
    Nov 2009
    Location
    Close Enough, IA
    Posts
    22,370
    Points
    592,255
    Level
    100
    Thumbs Up
    Received: 1,249
    Given: 687

    Re: FB Facility

    Quote Originally Posted by Rhoadhoused View Post
    Did you read the thread with the live video of the top of the scoreboard going up? It was 3 hours of 200 people making erection jokes while the scoreboard moved about an inch a minute.
    Terribly slow erection.





  14. #14
    Speechless
    Points: 191,434, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 0%
    Achievements:
    SocialRecommendation Second ClassVeteran50000 Experience Points
    ajk4st8's Avatar
    Join Date
    Mar 2006
    Location
    Ankeny
    Posts
    16,233
    Points
    191,434
    Level
    100
    Thumbs Up
    Received: 777
    Given: 1,832

    Re: FB Facility

    Maybe Viagra will sponser the building and it will help it get up faster.



  15. #15
    Starter
    Points: 21,209, Level: 44
    Level completed: 51%, Points required for next Level: 441
    Overall activity: 0%
    Achievements:
    Veteran10000 Experience Points
    Cyfan4good's Avatar
    Join Date
    Jul 2009
    Location
    Ankeny
    Posts
    688
    Points
    21,209
    Level
    44
    Thumbs Up
    Received: 39
    Given: 41

    Re: FB Facility

    Quote Originally Posted by Rhoadhoused View Post
    Did you read the thread with the live video of the top of the scoreboard going up? It was 3 hours of 200 people making erection jokes while the scoreboard moved about an inch a minute.
    Sorry I missed that one. I was in the stadium watching it.



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • TV: TBA
  • Football Season Opener vs. UNI
  • September 3, 2016
  • 07:00 PM