Bowling in the Endzone . . . question about insourcing.
Page 1 of 3 123 LastLast
Results 1 to 15 of 35
  1. #1
    Pro
    Points: 38,489, Level: 60
    Level completed: 54%, Points required for next Level: 561
    Overall activity: 0%
    Achievements:
    Veteran25000 Experience Points

    Join Date
    Oct 2007
    Posts
    2,035
    Points
    38,489
    Level
    60
    Thumbs Up
    Received: 15
    Given: 0

    Bowling in the Endzone . . . question about insourcing.

    Can (or Is . . . or Should) ISU use its own Engineer/Architecture Departments to reduce costs???



  2. #2
    Bench Warmer
    Points: 6,055, Level: 23
    Level completed: 1%, Points required for next Level: 495
    Overall activity: 0%
    Achievements:
    Veteran5000 Experience Points
    agronclone's Avatar
    Join Date
    Jul 2009
    Location
    des moines
    Posts
    345
    Points
    6,055
    Level
    23
    Thumbs Up
    Received: 0
    Given: 0

    Re: Bowling in the Endzone . . . question about insourcing.

    I don't think they can use their own departments in that way. I'm pretty sure that any construction would need to be bid on since ISU is part of the state government.



  3. #3
    Starter
    Points: 18,043, Level: 40
    Level completed: 99%, Points required for next Level: 7
    Overall activity: 0%
    Achievements:
    10000 Experience PointsVeteran
    CONEClone's Avatar
    Join Date
    Dec 2009
    Location
    Ames
    Posts
    798
    Points
    18,043
    Level
    40
    Thumbs Up
    Received: 0
    Given: 0

    Re: Bowling in the Endzone . . . question about insourcing.

    And while we're at it we can use student's as cheap labor!



  4. #4
    All-Star
    Points: 32,981, Level: 55
    Level completed: 94%, Points required for next Level: 69
    Overall activity: 0%
    Achievements:
    Veteran25000 Experience Points
    agrabes's Avatar
    Join Date
    Oct 2006
    Posts
    1,235
    Points
    32,981
    Level
    55
    Thumbs Up
    Received: 31
    Given: 0

    Re: Bowling in the Endzone . . . question about insourcing.

    No and no. The students don't have the experience to be designing something like that and the professors don't have the time and not all of them have the experience either. This is coming from a CE grad.

    Agronclone also has a good point. As part of the state government they are almost certainly required to bid out the design.



  5. #5
    Pro
    Points: 87,551, Level: 92
    Level completed: 6%, Points required for next Level: 1,799
    Overall activity: 5.0%
    Achievements:
    50000 Experience PointsVeteran
    VTXCyRyD's Avatar
    Join Date
    Sep 2010
    Posts
    3,341
    Points
    87,551
    Level
    92
    Thumbs Up
    Received: 188
    Given: 88

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by CONEClone View Post
    And while we're at it we can use student's as cheap labor!
    Makes sense to me. Then we can start rumors of how many students fell into the concrete and are forever part of the stadium.



  6. #6
    Addict
    Points: 164,488, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 12.0%
    Achievements:
    50000 Experience PointsCreated Album picturesVeteran
    CtownCyclone's Avatar
    Join Date
    Jan 2010
    Location
    Houston
    Posts
    8,901
    Points
    164,488
    Level
    100
    Thumbs Up
    Received: 185
    Given: 112

    Re: Bowling in the Endzone . . . question about insourcing.

    This would also require quite a few PE stamps. Not sure how many folks at an educational institution would have those, as prof types generally don't have the experience component required to obtain them.



  7. #7
    Starter
    Points: 18,043, Level: 40
    Level completed: 99%, Points required for next Level: 7
    Overall activity: 0%
    Achievements:
    10000 Experience PointsVeteran
    CONEClone's Avatar
    Join Date
    Dec 2009
    Location
    Ames
    Posts
    798
    Points
    18,043
    Level
    40
    Thumbs Up
    Received: 0
    Given: 0

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by CtownCyclone View Post
    This would also require quite a few PE stamps. Not sure how many folks at an educational institution would have those, as prof types generally don't have the experience component required to obtain them.
    Actually the staff ISU has in their Civil and Construction departments is more than capable in designing this from ground up. They just are required to bid out the design by the Board of Regents.



  8. #8
    Addict
    Points: 164,488, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 12.0%
    Achievements:
    50000 Experience PointsCreated Album picturesVeteran
    CtownCyclone's Avatar
    Join Date
    Jan 2010
    Location
    Houston
    Posts
    8,901
    Points
    164,488
    Level
    100
    Thumbs Up
    Received: 185
    Given: 112

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by CONEClone View Post
    Actually the staff ISU has in their Civil and Construction departments is more than capable in designing this from ground up. They just are required to bid out the design by the Board of Regents.
    Hmmm...Guess I was thinking of this with my "ME" glasses on. It would make more sense for the Civil guys to have more real-world experience (i.e. PE-worthy) in this kind of thing than other disciplines.

    Also, I would think that the design phase would take quite a bit longer if the ISU folks were to do it simply because they've got other responsibilities besides the stadium.



  9. #9
    Addict
    Points: 95,152, Level: 96
    Level completed: 6%, Points required for next Level: 1,898
    Overall activity: 2.0%
    Achievements:
    Veteran50000 Experience Points
    Frak's Avatar
    Join Date
    Apr 2009
    Location
    Dow City, IA
    Posts
    5,718
    Points
    95,152
    Level
    96
    Thumbs Up
    Received: 149
    Given: 67

    Re: Bowling in the Endzone . . . question about insourcing.

    Don't kid yourselves, this thing is already designed. RDG will design, Weitz will build. Yeah, RDG would have some work yet to do, but they have enough work put into it already that it wouldn't make sense to hand it off to someone else.



  10. #10
    Addict
    Points: 155,030, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 18.0%
    Achievements:
    SocialVeteran50000 Experience Points
    weR138's Avatar
    Join Date
    Feb 2008
    Posts
    7,670
    Points
    155,030
    Level
    100
    Thumbs Up
    Received: 180
    Given: 56

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by CtownCyclone View Post
    Hmmm...Guess I was thinking of this with my "ME" glasses on. It would make more sense for the Civil guys to have more real-world experience (i.e. PE-worthy) in this kind of thing than other disciplines.

    Also, I would think that the design phase would take quite a bit longer if the ISU folks were to do it simply because they've got other responsibilities besides the stadium.
    This. The campus arch/eng dept. (ISU employs architects and engineers for facility management, campus planning etc.) is too small to take on a JTS project and while we have plenty of professors who are PEs; a JTS project isn't in their job description. Factor in that for a state institution the project would have to be open to interviews and competitive bids; it couldn't be done on campus.

    And, as a pro, I prefer it this way.


    RIP Janice
    b. April 2012 d. April 2012
    9 posts
    May perpetual light shine upon him.

  11. #11
    Addict
    Points: 155,030, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 18.0%
    Achievements:
    SocialVeteran50000 Experience Points
    weR138's Avatar
    Join Date
    Feb 2008
    Posts
    7,670
    Points
    155,030
    Level
    100
    Thumbs Up
    Received: 180
    Given: 56

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by Frak View Post
    Don't kid yourselves, this thing is already designed. RDG will design, Weitz will build. Yeah, RDG would have some work yet to do, but they have enough work put into it already that it wouldn't make sense to hand it off to someone else.
    Yup.


    RIP Janice
    b. April 2012 d. April 2012
    9 posts
    May perpetual light shine upon him.

  12. #12
    Starter
    Points: 18,043, Level: 40
    Level completed: 99%, Points required for next Level: 7
    Overall activity: 0%
    Achievements:
    10000 Experience PointsVeteran
    CONEClone's Avatar
    Join Date
    Dec 2009
    Location
    Ames
    Posts
    798
    Points
    18,043
    Level
    40
    Thumbs Up
    Received: 0
    Given: 0

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by Frak View Post
    Don't kid yourselves, this thing is already designed. RDG will design, Weitz will build. Yeah, RDG would have some work yet to do, but they have enough work put into it already that it wouldn't make sense to hand it off to someone else.
    Actually I wouldn't be so sure about Weitz. With the work Mortenson has been doing on campus (Hach Hall, Getting Hilton Ready) and their unrivaled experience with stadiums I think they would be a better candidate. It also doesn't help Weitz didn't do too well when doing the East and West renovations.



  13. #13
    Addict
    Points: 83,325, Level: 89
    Level completed: 77%, Points required for next Level: 425
    Overall activity: 6.0%
    Achievements:
    Veteran50000 Experience Points

    Join Date
    Apr 2006
    Posts
    6,038
    Points
    83,325
    Level
    89
    Thumbs Up
    Received: 158
    Given: 0

    Re: Bowling in the Endzone . . . question about insourcing.

    Quote Originally Posted by CtownCyclone View Post
    Hmmm...Guess I was thinking of this with my "ME" glasses on. It would make more sense for the Civil guys to have more real-world experience (i.e. PE-worthy) in this kind of thing than other disciplines.

    Also, I would think that the design phase would take quite a bit longer if the ISU folks were to do it simply because they've got other responsibilities besides the stadium.
    Even the engineering buildings have been designed by outside firms. I don't know that anything has been designed by professors in the college for a long time.



  14. #14
    Addict
    Points: 66,681, Level: 80
    Level completed: 15%, Points required for next Level: 1,369
    Overall activity: 15.0%
    Achievements:
    Recommendation Second ClassVeteran50000 Experience Points
    Rogue52's Avatar
    Join Date
    Oct 2006
    Location
    Cedar Rapids, IA
    Posts
    6,054
    Points
    66,681
    Level
    80
    Thumbs Up
    Received: 161
    Given: 4

    Re: Bowling in the Endzone . . . question about insourcing.

    Paging GoShow.

    Time to write a check...



  15. #15
    Addict
    Points: 143,689, Level: 100
    Level completed: 0%, Points required for next Level: 0
    Overall activity: 4.0%
    Achievements:
    SocialVeteran50000 Experience Points
    RayShimley's Avatar
    Join Date
    Sep 2008
    Location
    Montreal, QC
    Posts
    6,052
    Points
    143,689
    Level
    100
    Thumbs Up
    Received: 93
    Given: 30

    Re: Bowling in the Endzone . . . question about insourcing.

    Will never happen because of non-compete laws in the State. This is also why the Vet School can't offer cheap vet services to the public.



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
  • TV: Mediacom 22
  • HOOPS: Iowa State vs. Drake
  • December 20, 2014
  • 04:00 PM